Traditional site surveys take weeks. The alternative — calling a drafter, emailing the request, waiting 48–72 hours, reviewing a PDF that may have errors — is faster but still slow.
InQI generates a scaled, editable site plan in under 60 seconds for most US addresses or Assessor's Parcel Numbers (APNs). Here's how.
What Goes Into an InQI Site Plan
InQI combines three data layers to build every site plan:
Parcel lines — the lot boundary and dimensions for the address or APN, which become the edges of your site plan.
High-resolution aerial imagery — Updated multiple times per year for most US properties. AI processes the imagery to detect existing structures, driveways, hardscape, trees, and other site features automatically. InQI maintains access to historical imagery as well — useful for seeing how a property has changed over time.
Topographic data — Elevation and contour data for slope analysis, drainage planning, and grading assessments.
The Result: What You Actually Get
A scaled, overhead drawing that shows:
- Lot lines with dimensions
- Setback lines where they apply
- Existing house footprint, garage, driveways, pool, decks, and detached structures
- Terrain contours and slope indicators
- North arrow and labeled scale bar
- Property address and APN
Everything is editable in the browser. Add a proposed structure. Label dimensions. Adjust elements. Export as PDF for review and permit preparation, or DXF for CAD.
Know your property before you hire anyone.
Sign up for freeHow accurate is an InQI site plan?
InQI pulls the parcel lines, existing structures, terrain and high-resolution aerial imagery for the address or APN and turns them into a scaled, editable site plan. You can check and edit every line before you export. The site plan is scaled and data-backed for feasibility, early design and permit preparation. It is not a legal boundary survey, and detail can vary by location. When exact property lines matter, use a licensed surveyor — see site plan vs. property survey.
Use Cases
ADU placement — See where a detached or attached ADU could go on your site plan, then run Codes.IQ to check the setbacks and rules for your address, with citations.
Pool and deck design — Find a spot that works with the existing layout on your site plan, then confirm setbacks and safety distances with your building department.
Landscape planning — Understand the full property before laying out planting zones, irrigation, or hardscape improvements.
Permit preparation — Export a scaled PDF site plan with the proposed project drawn on it for your permit preparation. See how to get a site plan for a building permit for what departments usually ask for.




